Case studies

Ecological services for logistics warehouse in Ellesmere Port

descrition of image goes here

Aliquet nec orci mattis amet quisque ullamcorper neque, nibh sem. At arcu, sit dui mi, nibh dui, diam eget aliquam. Quisque id at vitae feugiat egestas ac. Diam nulla orci at in viverra scelerisque eget. Eleifend egestas fringilla sapien.

The challenge

We offered a variety of Ecological services to the Ellesmere Port site which was previously a paper mill located next to the Manchester Ship Canal, which had also been used for storing glass cullet from an off-site operator. The proposed development plan involved constructing two large logistics warehouses, with the largest one covering an area of approximately 654,000 ft2. However, the site presented various challenges, including the presence of relict structures, drainage systems, and groundwater abstraction boreholes. In addition, there were accessibility issues due to glass cullet stockpiles, a steep slope, and potential ecological sensitivities.

descrition of image goes here
17c. Image & Caption

17d. Featured Text — Lorem ipsum dolor sit amet consectetur. Ultricies nascetur ligula senectus quam morbi nunc non sodales. Sit dui bibendum interdum pellentesque aenean non ultricies sagittis ac. Egestas vitae.

Full name, role

Our solution

To address these challenges, E3P was commissioned to review existing site investigation reports, map areas of glass cullet and associated waste materials, conduct a phase of supplemental site investigation, and develop a remediation and enabling works strategy using re-engineered materials. E3P also undertook a detailed settlement analysis and slope stability assessment, developed a comprehensive remediation strategy, provided validation through contractor test data review and weekly site visits, and closed a former groundwater well and several abstraction boreholes.

Furthermore, E3P provided ecological services such as a preliminary ecological appraisal, bat emergence surveys, and great crested newt surveys. During construction, E3P ecologists also monitored Peregrine Falcon activity on a water tower.

17e. Video

100%

17f. Stats

Lorem ipsum dolor sit amet consectetur. Sed vitae congue aenean dictum. Ultricies nulla id tincidunt sed congue. Etiam massa curabitur turpis enim tincidunt proin. In adipiscing et vestibulum faucibus.

98%

Title will go here

Lorem ipsum dolor sit amet consectetur. Sed vitae congue aenean dictum. Ultricies nulla id tincidunt sed congue. Etiam massa curabitur turpis enim tincidunt proin. In adipiscing et vestibulum faucibus.

125+

Title will go here

Lorem ipsum dolor sit amet consectetur. Sed vitae congue aenean dictum. Ultricies nulla id tincidunt sed congue. Etiam massa curabitur turpis enim tincidunt proin. In adipiscing et vestibulum faucibus.

  • descrition of image goes here
  • descrition of image goes here
  • descrition of image goes here

Outcome

E3P’s broad multi-disciplinary approach enabled the timely resolution of potential constraints and the development of cost-effective and sustainable solutions. Retaining materials on-site eliminated the need for significant off-site disposal, and potential pathways were identified and addressed, reducing long-term environmental risks.

17h. Two Column Images